Project Overview
CSULB’s Walter Pyramid is one of Long Beach’s most prominent buildings and one of only three true pyramid-style buildings in the U.S. The 18-story arena is home to the university’s basketball and volleyball teams and has hosted other NCAA events. CSULB hired our team to design upgrades to the pyramid’s light fixtures and controls at the main level entrances, replacing HID fixtures with energy-efficient RGB LEDs.
Read More
Solution
Our lighting designers created new, programmable DMX lighting controls that offer flexibility to users, allowing them to adjust colors and illuminations levels for a variety of events. The project included an initial field investigation before design and involved demolition plans for the old site lighting. The new lights and controls are all Title 24 compliant and were designed with detailed lighting schedules to maximize efficiency. Our team also provided construction cost estimates and construction support services to see the project out to full construction.
Bold Text:Regular Text (For Specs) Bold Text:Regular Text Bold Text:Regular Text Bold Text:Regular Text
P2S provided Mechanical, Electrical, and Plumbing engineering design for the two-story Critical Care Building (CCB) with a new Central Utility Plant and emergency airlift helipad. The CCB consists of a new emergency department, procedure rooms, and med-surge patient beds. Because the hospital was so focused on preparing for future development, the design called for constant reassessment and forward-thinking about the needs of the hospital community in the next 50-100 years.
Scripps CCB (Done) (2013-6973)
Bold Text:Regular Text (For Specs) Bold Text:Regular Text Bold Text:Regular Text Bold Text:Regular Text
P2S provided Mechanical, Electrical, and Plumbing engineering design for the two-story Critical Care Building (CCB) with a new Central Utility Plant and emergency airlift helipad. The CCB consists of a new emergency department, procedure rooms, and med-surge patient beds. Because the hospital was so focused on preparing for future development, the design called for constant reassessment and forward-thinking about the needs of the hospital community in the next 50-100 years.