Fill out the form below to sign up for our mailing list and download this project.
Project Overview
P2S provided lighting design for CSULB’s renovation of the George Allen Sports Field. The new sports lighting is compliant with NCAA standards and covers three separate fields. We also designed a new 12KV transformer and 480V distribution section to support the new, high-intensity lighting and additional support lighting at a future softball field.
Read More
Solution
P2S lighting designers conducted a field investigation and photometric studies to identify the number of fixtures to meet NCAA illumination standards. They created a lighting plan showing fixture locations and designed site power infrastructure. The new lighting more than gets the job done, as CSULB athletes and sports fans can attest.
Bold Text:Regular Text (For Specs) Bold Text:Regular Text Bold Text:Regular Text Bold Text:Regular Text
P2S provided Mechanical, Electrical, and Plumbing engineering design for the two-story Critical Care Building (CCB) with a new Central Utility Plant and emergency airlift helipad. The CCB consists of a new emergency department, procedure rooms, and med-surge patient beds. Because the hospital was so focused on preparing for future development, the design called for constant reassessment and forward-thinking about the needs of the hospital community in the next 50-100 years.
Scripps CCB (Done) (2013-6973)
Bold Text:Regular Text (For Specs) Bold Text:Regular Text Bold Text:Regular Text Bold Text:Regular Text
P2S provided Mechanical, Electrical, and Plumbing engineering design for the two-story Critical Care Building (CCB) with a new Central Utility Plant and emergency airlift helipad. The CCB consists of a new emergency department, procedure rooms, and med-surge patient beds. Because the hospital was so focused on preparing for future development, the design called for constant reassessment and forward-thinking about the needs of the hospital community in the next 50-100 years.