Fill out the form below to sign up for our mailing list and download this project.
New student services center reaches LEED Platinum Certification
Read More
Project Overview
The Crafton Hills College campus had not undergone major facility upgrades since its opening in 1972. P2S helped revive the campus by providing mechanical, electrical, plumbing and technology design services to the new Crafton Center. The new campus hub is located where the former library once stood.
Read More
Solution
P2S provided MEPT and Fire Protection Design for the new facility, which houses student services and amenities including administrative offices, versatile event and conference space, food service areas and study spaces. Scoring 80 total points from the United States Green Building Council, the building’s design achieved LEED Platinum Certification.
Bold Text:Regular Text (For Specs) Bold Text:Regular Text Bold Text:Regular Text Bold Text:Regular Text
P2S provided Mechanical, Electrical, and Plumbing engineering design for the two-story Critical Care Building (CCB) with a new Central Utility Plant and emergency airlift helipad. The CCB consists of a new emergency department, procedure rooms, and med-surge patient beds. Because the hospital was so focused on preparing for future development, the design called for constant reassessment and forward-thinking about the needs of the hospital community in the next 50-100 years.
Scripps CCB (Done) (2013-6973)
Bold Text:Regular Text (For Specs) Bold Text:Regular Text Bold Text:Regular Text Bold Text:Regular Text
P2S provided Mechanical, Electrical, and Plumbing engineering design for the two-story Critical Care Building (CCB) with a new Central Utility Plant and emergency airlift helipad. The CCB consists of a new emergency department, procedure rooms, and med-surge patient beds. Because the hospital was so focused on preparing for future development, the design called for constant reassessment and forward-thinking about the needs of the hospital community in the next 50-100 years.