Long Beach Community Hospital | P2S Inc.

Long Beach Community Hospital

Central Utility Plant and Infrastructure Replacement

CHLB 5 W
CHLB 5 W
CHLB 6 W
CHLB 6 W
CHLB 7 W
CHLB 7 W
Long Beach Community 4 W
Long Beach Community 4 W
  • Location

    Long Beach, CA
  • Project Dates

    January 2020 - 2025 (Est.)
  • Size

    80,000 SF
  • Construction Cost

    $65 million
  • Market

    Healthcare
  • Project Overview

    With Long Beach Community Hospital currently re-opening, P2S is helping to restore healthcare to the community right in our Long Beach office’s backyard, with a direct impact on many of our employees. We're providing MEPT and fire protection design and engineering services for the historic hospital's SPC/NPC Seismic Upgrade and Acute Care Renovation project. The project includes a new Central Utility Plant, infrastructure reconnection to compliant hospital buildings and related renovation of approximately 80,000 SF of existing hospital.

    Read More
  • Solution

    The overall project is complex in nature with many phases, existing site constraints, and the challenge of maintaining hospital operations while performing a significant retrofit to the existing utility systems. Another unique factor for this project is the campus' proximity to an active earthquake fault which produces challenges between various jurisdictions that govern hospital operations and the specific engineering challenges of utility systems that need to continue functioning in the event of an earthquake.

    Read More

Form has been submitted successfully!